潁璋 Cold Bending 園地
針對新世代超大型燃氣複循環發電廠之管線工程技術分析:304H不銹鋼管材、感應彎管與IH-PBHT熱處理工法之差異化研究 (Technical Analysis of Piping Engineering for New-Generation Mega-Scale Combined Cycle Gas Turbine (CCGT) Power Plants: A Comparative Study of 304H Stainless Steel, Induction Bending, and IH-PBHT Processes)
摘要 在全球能源轉型與淨零碳排的嚴格政策驅動下,燃
2026-05-02
聯合循環電廠餘熱蒸汽發生器(HRSG)管線邊界與法規適用性之深度研究:BP、BEP與NBEP之系統界線及工程實務分析 (An In-Depth Study on Piping Boundaries and Regulatory Compliance for Heat Recovery Steam Generators (HRSG) in Combined Cycle Power Plants: Analytical Framework of BP, BEP, and NBEP System Interfaces and Engineering Practices)
摘要 在現代聯合循環電廠(Combined Cyc
2026-05-02
鍋爐外部配管(BEP)之法規交界解析與冷彎管工法之戰略應用:基於 ASME Section I 與 B31.1 雙重標準之工程與數位化實務 (Jurisdictional Boundaries of Boiler External Piping (BEP) and Strategic Application of Cold Bending: Engineering and Digitalization Practices Under ASME Section I and B31.1 Dual Standards)
緒論:超臨界汽電系統中的管轄權迷宮與工程技術之演進
2026-05-02
複循環電廠(CCPP)P91/P92高能管線工法之深度研究:3D/5D彎管與1.5D電銲彎頭在水錘與蒸氣錘衝擊下的力學表現、殘餘應力演化與微觀組織穩定性分析 (In-depth Research on High-Energy Piping Construction Methods for CCPP: A Comparative Analysis of 3D/5D Bends vs. 1.5D Welded Elbows regarding Mechanical Performance under Water/Steam Hammer, Residual Stress Evolution, and Microstructural Stability in P91/P92 Steels)
摘要 隨著現代複循環電廠(Combined Cyc
2026-05-02
