潁璋 Cold Bending 園地
基於ASME B31J與冶金閉環之大型CCPP專案高能管線預製實務化:潁璋工程CNC冷作彎管與IH-PBHT一站式人力資源優化分析研究 (Practical Implementation of High-Energy Piping Prefabrication for Large-Scale CCPP Projects Based on ASME B31J and Closed-Loop Metallurgy: A Study on One-Stop Human Resource Optimization of Ying-Zhang Engineering’s CNC Cold Bending and IH-PBHT)
摘要 在全球能源結構轉型與淨零碳排(Net Zer
2026-07-14
針對 2026 年強制執行 ASME B31.1 規範下 P91 (Grade 91) 高能管線冷彎成型 (ε=5%-20%) 配合局部熱處理之實務操作與完整性管理策略 (Practical Operations and Integrity Management Strategies for P91 (Grade 91) High-Energy Piping: Cold Bending (ε=5%-20%) with Induction Heating Post-Bending Heat Treatment (IH-PBHT) under 2026 Mandatory ASME B31.1 Enforcement)
一、 緒論 1.1 前言:台灣能源轉型與高能管線的
2026-07-14
沿海發電廠建廠特性與防蝕材料工程差異化分析:以台灣西部與東北角電廠之流體傳輸管線銲接與冷作工法為主軸 (Differentiation Analysis of Coastal Power Plant Construction Characteristics and Corrosion Prevention Material Engineering: A Focus on Fluid Transmission Pipeline Welding and Cold Working Methods in Western and Northeast Taiwan)
一、 緒論 現代化大型基載發電設施的建置與改建工程
2026-07-14
